Five lines. One of them is probably yours.
Physical specification and what sits inside each line. Output figures and prices come with a conversation, not from a web page.
Full line layout · rack to finished barCT2
Straight rebar · two barsThe entry line. Smallest footprint of the three and the usual starting point for a plant running one or two diameters.
CT4
Straight rebar · four barsThe common choice. Enough line for a plant selling into private work with room to take a bigger order.
CT6
Straight rebar · six barsWhat we run at Pithampur. Same footprint as the CT4, more bars through it.
CNC bent
Bent elementsStirrups and shaped elements, cut and bent to drawing. Different economics from straight bar, usually better.
Inside the line
Eight stations in a row. Each one can spoil what the one before it did, which is why a four-hour run tells you more than a specification sheet.
The lines also run basalt and carbon fibre, and epoxy, vinyl ester or polyester resin systems.